In Southwest Washington, it's not a question of whether your site will get rained on. It's how ready the site is when it does. Good site prep is what separates a project that keeps moving through the wet months from one that turns into a mud pit.
Why water is the biggest threat to your foundation
Water that collects around a foundation softens the soil underneath it. Over time that can lead to settling, cracks and wet crawlspaces. Fixing drainage after the house is built costs far more than getting it right during excavation.
1. Grade the site so water leaves
The ground around your building pad should slope away from the structure on every side. We set grades during excavation so runoff heads toward a ditch, swale or drain, never toward the house.
2. Build the pad on the right material
Much of our local ground holds water. Native soil that's soft or full of organic material should be removed and replaced with compacted structural fill or rock. A firm pad keeps foundations level and gives trucks somewhere to stand.
3. Plan where roof and surface water will go
A roof sheds a lot of water in a Western Washington storm. That water needs a planned path: downspouts tied into drain lines, a dispersion trench, a dry well or a ditch, depending on your site and local rules. Footing drains around the foundation carry away groundwater before it builds up.
4. Control erosion from day one
Bare dirt washes away fast in heavy rain. Silt fence, straw, rock construction entrances and covering stockpiles keep your soil on your property and out of ditches and streams. On larger jobs, it's also the law: sites that disturb one acre or more generally need coverage under Washington's Construction Stormwater General Permit.
5. Put in a rock driveway early
A rocked access road is one of the best investments in a wet-season project. It keeps concrete trucks, delivery trucks and crews from tearing up the site and getting stuck.
6. Time the work to the weather
Some work is best done in the dry months, like large cuts and fills or drainfield installation in soils that smear when wet. Other work, like clearing, rocking and utility trenching, can often keep going through the winter with the right approach. A contractor who plans around the season keeps your schedule realistic.
One crew, one plan for water
Drainage works best when the same crew handles the clearing, grading, foundation excavation and utilities. Nothing gets lost between trades. Rockridge provides Excavation & Grading, Stormwater & Drainage, Foundation Excavation and Retaining Walls across Lewis and Cowlitz County.